Three-vessel brewhouse standing in a brewery brewhouse hall, mirror-polished vessels under warm hall light

Turnkey brewhouse equipment, 3 to 60 BBL

27 export markets · 400+ brewhouses installed

[ Brewhouse systems ]

Four brewhouse layouts

2-vessel brewhouse: Mash/lauter tun + kettle/whirlpool

2-vessel

Mash/lauter tun + kettle/whirlpool

Taprooms and brewpubs, 3 to 10 BBL

3-vessel brewhouse: Mash tun · lauter tun · kettle/whirlpool

3-vessel

Mash tun · lauter tun · kettle/whirlpool

Production breweries, 10 to 30 BBL

4-vessel brewhouse: Mash · lauter · kettle · whirlpool

4-vessel

Mash · lauter · kettle · whirlpool

Four to six brews a day, 20 to 50 BBL

5-vessel brewhouse: Mash · lauter · kettle · whirlpool · hot liquor

5-vessel

Mash · lauter · kettle · whirlpool · hot liquor

Continuous brewing from 60 hL up

Layout 1 of 4

Rows of conical fermentation tanks receding into a brewery cellar, tank cone and sample valve in the foreground

[ Turnkey scope ]

What the package includes

Six blocks, one contract: milling to canning.

Brewhouse and cellar

  • Malt handling and millingSilo, auger, 2- or 4-roller mill, grist case
  • Brewhouse2 to 5 vessels, electric or steam, direct fire on request
  • CellarUnitank and brite tanks, 3–120 BBL, dry hop port and carb stone

Utilities and packaging

  • CIP and utilities2- to 4-tank CIP skid, glycol chiller, hot liquor and air
  • ControlsPLC with recipe steps, UL 508A or CE panel, remote support
  • PackagingKeg washer and filler, canning line from 12 to 60 cpm

[ How a project runs ]

From floor plan to first brew

30–50 days
3–5 years
27

Drawings, fabrication and shipping each have one owner.

Tank fabrication drawings and a welding record folder spread on a stainless work table with a caliper
  1. Enquiry and site planYou send batch volume, site plan and ceiling height.
  2. Layout and budget quoteWithin three working days: layout drawing and a line-by-line scope price.
  3. Drawing approvalVessel sizes, heating, panel and finish signed off; 30% deposit.
  4. Fabrication30–50 days in our own workshop; weekly photos and weld maps.
  5. Shipping and start-upSea freight, customs documents per market, remote commissioning support.
Plate rolling: Shell and dish rolled to 3–12 mm, diameter held ±1.5 mmTIG welding: Full-penetration butt welds, purge gas on the product sidePickling and polish: Weld dressing to Ra 0.8 µm on product contact surfacesPressure and leak test: Hydro test at 1.5× design pressure, record filed per vessel

[ Workshop ]

Rolled and welded in house

  • Shell and dish rolled to 3–12 mm, diameter held ±1.5 mm

  • Full-penetration butt welds, purge gas on the product side

  • Weld dressing to Ra 0.8 µm on product contact surfaces

  • Hydro test at 1.5× design pressure, record filed per vessel

Declared standards

  • ISO 9001:2015
  • CE
  • PED 2014/68/EU
  • UL 508A
  • EN 1.4301
  • EN 1.4404

[ Start a project ]

Send us your floor plan

Batch volume, vessel count and site plan — that is enough to quote.

Privacy: we use these details only to answer this enquiry. No newsletter, no third parties.