
Commercial & industrial BESS
Industrial battery storage, sized to your plant’s load curve
We start from your metering data, not a catalogue. Capacity, C-rate and grid interface are set per site — then integrated, commissioned and maintained under one contract.
How we size
Three inputs decide the configuration
- 01
Metering data in
Twelve months of 15-minute interval data, your tariff structure, and the contracted peak your grid operator holds you to.
- 02
Configuration out
Usable capacity, C-rate, cabinet count and grid interface — each derived from the profile above, not picked from a range.
- 03
Payback modelled
Against your tariff, before you commit. The model travels with the quote so your finance team can check the arithmetic.

What the numbers turn into: module trays, busbars and looms, built to the configuration above.
- Integrating since
- 2019
- Delivered across three sites
- 4.6 MWh
- Remote response, business days
- 4 h
Delivered systems
Three sites, three tariff problems
Each of the three started as a metering file and a tariff bill. What follows is what was actually commissioned.

- 2.1 MWhPeak shavingmodelled payback 5.8 yr
- 940 kWhDemand-charge managementmodelled payback 6.4 yr
- 1.6 MWhPrice arbitragemodelled payback 5.1 yr
Client names withheld — none of the three has released us to publish them. Capacity, country, application and commissioning year are as delivered.
When something fails
Response times we sign for

- Remote diagnosis
- 4 hours, business days
- On-site attendance
- Next business day, Benelux and western Germany
- Spare inverter and module
- Held in Rotterdam
- Monitoring
- Continuous, with alarms routed to your maintenance desk
Certification
What we hold, and what we don’t
Certificates are downloadable in full. Where we have not certified for a market, the row says so.

| Standard | Scope | Status | Document |
|---|---|---|---|
| IEC 62619 | Cell and battery safety, industrial applications | Certified | IEC62619-cert.pdf 1.2 MB |
| IEC 62477-1 | Safety of power electronic converter systems | Certified | IEC62477-cert.pdf 0.9 MB |
| CE | EU declaration of conformity, complete system | Declared | CE-DoC.pdf 0.4 MB |
| UL 9540A | Thermal runaway fire propagation, North America | Not held — we do not supply North America | |

Factory acceptance
Every system is built up and tested here in full before it ships. You are welcome to attend the acceptance test.
Request a quote
Send the load profile, get the configuration
We reply within one business day with an indicative configuration and a payback range — or with the questions we need answered first.
Quote requests answered within one business day.