Filling machinery · Zhangjiagang
Filling, capping, labeling lines for liquids and pastes
Piston, overflow, capping, labeling, monoblock and complete lines.

- Line speed1,200–12,000bottles/h
- Fill accuracy±0.5%of fill volume
- Before shipment4-hour FATon your bottles
Machines
Six machine families
CW-PFServo piston fillers50–5,000 mlup to 100,000 cP
CW-OFOverflow and gravity fillerslevel fill ±1 mm4–24 heads
CW-SCServo spindle cappers0.5–6 N·m120 caps/min
CW-LBWrap-around and front-back labelers±0.5 mm200 bottles/min
CW-MBFill-cap monoblocks1,200–6,000 bottles/hchangeover under 20 min
CW-LINEComplete filling linesup to 12,000 bottles/hone PLC
Applications
What the lines fill
- 01

Water, juice and edible oil
- Product
- Thin liquids, still or lightly foaming
- Container
- PET 250 ml–5 L
- 02

Sauces, honey and pastes
- Product
- 10,000–100,000 cP, particulates to 6 mm
- Container
- Glass jars and squeeze bottles
- 03

Shampoo, lotion and cosmetics
- Product
- Creams and gels, pump and trigger closures
- Container
- HDPE and PET 50–1,000 ml
- 04

Detergents and household chemicals
- Product
- Foaming and corrosive liquids
- Container
- HDPE 500 ml–5 L with handles

Factory acceptance test
Run on your bottles first
Six FAT bays; every line runs here before it is crated.
- Run4-hour continuous runon your bottles, caps and product
- Fill weight100-bottle logconsecutive bottles, weighed
- TorqueCap torque samplesset per recipe, recorded
- VideoFull FAT videosent before shipment
Compliance
Standards the machines meet

- ISO 9001:2015Design, manufacture and service of filling machinery
- CE · Machinery Directive 2006/42/ECEvery machine shipped to the EU
- EN 60204-1Electrical equipment of machines
- UL 508AControl panels for North America, on request
- AISI 316LAll product-contact parts
- FDA 21 CFR 177.2600Seals and gaskets in the product path

Company
The plant in Zhangjiagang
- 2011
- Founded
- 16,500 m²
- Assembly and FAT halls
- 40
- Complete lines shipped a year
- 72%
- Exported
Shipped to PL · RO · DE · SA · AE · NG · KE · ZA · MX · CO · VN · PH
Tour the assembly and FAT hallsQuote
Send your bottle, get a line
Layout and quote within 3 working days of your bottle drawings.

- Lead time35–45 days single machine · 60–75 days line
- Emailsales@caskwellpack.com
- WhatsAppOpen chat