Panel stacks under a gantry crane at dusk, with a loader moving between them
[PANELS FOR PROGRAMME WORK]

Building Panels, Installed to Programme

Cut to the panel schedule, dispatched with the batch records, erected by crews we put on site.

  • EN 12602 · CE
  • EN 13501-1 A1
  • Per-cycle batch records
[INSTALLATIONS]

Panels in Service

Representative jobs, listed by sector and region. Clients are not named.

  1. Logistics warehouse — external wallsBekasi, Indonesia42,000 m²2024CF-ALC100 + CF-FC08
  2. Data hall — partitions and ceilingsBắc Ninh, Vietnam18,500 m²2024CF-PT75 + CF-AC12
  3. Multi-storey factory — floor decksSharjah, UAE26,000 m²2023CF-DK150
  4. Hospital block — shaft enclosuresNairobi, Kenya9,400 m²2023CF-FR60
[SYSTEMS]

Panel Systems Compared

Six systems, one page. Values are declared at 28 days unless stated.
SystemUseThicknessDensityStrengthFireSoundPanel sizeStandard
CF-ALC100External infill100 mm500 kg/m³4.0 MPaA1Rw 40 dB600 × 2400EN 12602
CF-FC08Rainscreen8 mm1500 kg/m³18 MPa MORA2-s1,d01200 × 2400EN 12467
CF-PT75Partition75 mm560 kg/m³3.6 MPaA1Rw 42 dB600 × 2700EN 12602
CF-DK150Floor deck150 mm620 kg/m³5.0 kN/m² liveREI 120Rw 48 dB600 × 3000EN 12602
CF-AC12Acoustic ceiling12 mm1400 kg/m³NRC 0.65A1NRC 0.65600 × 600EN 13964
CF-FR60Fire shaft60 mm620 kg/m³3.8 MPaEI 120Rw 36 dB600 × 2400EN 12602
[INSTALLATION]

Installation and Jointing

  • Joint width 8 mm, one groutPanels are cut to the schedule; the joint is filled in one pass with the supplied grout.
  • Embedded plates, not cast-in boltsSetting-out drawings go out before the first load; plates are welded to the frame on site.
  • Crane and crew togetherAbove 20,000 m² we put our own erectors on site with the customer's crane.
Download the setting-out pack
Erectors landing a floor deck panel onto welded plates on a steel frame
Panel packs being craned off a flatbed at a construction site gate

From the autoclave to the gate: the same heat number on the panel, the pack and the delivery note.

[FIRE AND THERMAL]

Fire and Thermal Performance

Reaction-to-fire classification, conductivity and acoustic values as tested.
SystemFire classConductivitySoundReaction to fireStandardReport
CF-ALC100A10.13 W/mKRw 40 dBNon-combustibleEN 13501-1FR-ALC100-4471
CF-FC08A2-s1,d00.35 W/mKLimited combustibilityAS 1530.1FR-FC08-2210
CF-PT75A10.14 W/mKRw 42 dBNon-combustibleEN 13501-1FR-PT75-3915
CF-DK150REI 1200.15 W/mKRw 48 dBNon-combustibleEN 13501-2FR-DK150-5102
CF-AC12A10.19 W/mKNRC 0.65Non-combustibleEN 13501-1FR-AC12-3388
CF-FR60EI 1200.16 W/mKRw 36 dBNon-combustibleEN 13501-2FR-FR60-2740
[RANGE]

The Panel Range

  • Stacked autoclaved lightweight concrete panels on the yard
    CF-ALC100

    ALC panel

    100 mm · 500 kg/m³

  • Fibre-cement façade panels in a rainscreen cassette
    CF-FC08

    Façade panel

    8 mm · 18 MPa MOR

  • Partition panels stacked beside a single-storey wall under construction
    CF-PT75

    Partition panel

    75 mm · Rw 42 dB

  • Floor deck panels craned into a steel frame at a mezzanine level
    CF-DK150

    Floor deck

    150 mm · REI 120

  • Perforated acoustic ceiling panels laid into a dark grid
    CF-AC12

    Ceiling panel

    12 mm · NRC 0.65

  • Fire-rated shaft panels lining a service riser
    CF-FR60

    Fire shaft panel

    60 mm · EI 120

[PROGRAMME]

Programme Overruns Are Not an Option

98.6%
On-time dispatch
6 weeks
Scheduling lead time
4 crews
Installation teams
[PANEL SCHEDULE]

Request a Panel Schedule

Send the drawings and the area. We come back with a panel schedule, a delivery sequence and a price per m².

We use these details only to answer this enquiry. See our privacy statement.