Panel stacks under a gantry crane at dusk, with a loader moving between them
[PANELS FOR PROGRAMME WORK]

ALC and Fibre-Cement Building Panels, Installed to Programme

Walls, floor decks and fire shafts — cut to your panel schedule.

  • EN 12602 · CE
  • EN 13501-1 A1
  • Per-cycle batch records
[INSTALLATIONS]

Panel Systems by Building Type

Four delivered projects, by building type. Clients are not named — areas, dates and systems are as shipped.

  • Logistics warehouse in Bekasi with external walls built from CF-ALC100 lightweight concrete panels

    ALC panels for warehouse walls

    External infill walls and rainscreen

    CF-ALC100 + CF-FC08

    Bekasi, Indonesia · 2024

    42,000 m² delivered

  • Data hall fit-out in Bac Ninh with CF-PT75 partition panels and a CF-AC12 perforated acoustic ceiling

    Partition and ceiling panels for data halls

    Partitions, shafts and acoustic ceilings

    CF-PT75 + CF-AC12

    Bắc Ninh, Vietnam · 2024

    18,500 m² delivered

  • Multi-storey plant in Sharjah with CF-DK150 floor deck panels laid across the steel frame

    Floor deck panels for multi-storey plants

    Floor decks and mezzanines

    CF-DK150

    Sharjah, UAE · 2023

    26,000 m² delivered

  • Hospital service riser in Nairobi lined with CF-FR60 fire-rated shaft panels

    Fire-rated shaft panels for hospitals

    Service shafts and escape stair cores

    CF-FR60

    Nairobi, Kenya · 2023

    9,400 m² delivered

See delivered projects
[MATERIAL]

Surface Finish and Panel Core

Installed facade and the panel's own cell structure.

Completed ventilated rainscreen facade in CF-FC08 fibre-cement panels, open-joint cassette grid in raking afternoon sun
CF-FC08 rainscreen, open-joint cassettes on a mid-rise industrial block.
Macro cross-section of a CF-ALC100 autoclaved lightweight concrete panel showing the closed air-cell structure and a sawn factory edge
CF-ALC100 cross-section — the closed cell structure that carries λ 0.13 W/mK.
See finishes and panel sizes
[INSTALLATION]

Installation and Jointing

  • Joint width 8 mm, one groutPanels are cut to the schedule; the joint is filled in one pass with the supplied grout.
  • Embedded plates, not cast-in boltsSetting-out drawings go out before the first load; plates are welded to the frame on site.
  • Crane and crew togetherAbove 20,000 m² we put our own erectors on site with the customer's crane.
CAD blocks, BIM families and spec sheets
Erectors landing a floor deck panel onto welded plates on a steel frame
Panel packs being craned off a flatbed at a construction site gate

From the autoclave to the gate: the same heat number on the panel, the pack and the delivery note.

[PROGRAMME]

Programme Overruns Are Not an Option

98.6%
On-time dispatch
6 weeks
Scheduling lead time
4 crews
Installation teams
[CERTIFICATES]

Certified by System and Market

  • CE / EN 12602
  • EN 13501-1 A1
  • EN 12467
  • EN 13964
  • AS 1530.1
  • ISO 9001

Certificates and expiry dates by system and market.

Panel coupon clamped in a three-point bending rig beside the fire-test furnace in the Clayforth in-house laboratory
[PANEL SCHEDULE]

Request a Panel Schedule

Send the drawings and the area. Panel schedule and price per m².

We use these details only to answer this enquiry. See our privacy statement.