
Sheet metal Build-to-print Fabrication
- Laser cutting
- CNC forming
- Welding and fabrication
- CNC machining
- Surface finishing
- Assembly and kitting
Every part is made to your drawing. ±0.2 mm cut and formed, ±0.02 mm machined.
Send a drawing(PROCESSES)
Six processes, one shop






One roof, no handoffs
Cutting, forming, welding, machining, finishing and assembly run in the same two shops — one route card, one inspection record.
- Laser cutting0.5–25 mm mild steel · 6,000 × 2,000 mm bed
- CNC forming160 t / 320 t press brakes · ±0.5° bend angle
- Welding and fabricationWPS and WPQR to ISO 15614-1 · welders to ISO 9606-1
- CNC machining±0.02 mm · milling 2,000 × 800 mm
- Surface finishingHot-dip galvanised to EN ISO 1461 · powder coated to EN 13438
- Assembly and kittingSub-assemblies · bolt-together frames · export crating
(DRAWING INTAKE)
After you send the drawing
A drawing in, a priced route out — with the DFM notes you need before you commit to a batch.



- 01 · Send the file
DXF, DWG, STEP or a dimensioned PDF, with material, quantity and finish. A paragraph of what the part does helps more than a page of notes.
- 02 · Quote
Material, tolerance, finishing and packing land line by line on the quotation, with the DFM notes that would make the part cheaper.
- 03 · First article
First article in 10–15 working days with its dimensional report and material certificates. Batch runs start once you have signed it off.
(WHERE THEY GO)
Where these parts end up
Material handling and logisticsconveyor frames · chutes · guards
Construction and agricultural machinerychassis brackets · booms · platforms
Energy storage and powerbattery racking · cabinet frames · busbar supports
Food and packaging machinery304 and 316L frames · washdown covers
Rail and transport fixtureswelding jigs · fixtures · underframe brackets
Mining and screeningwear plates · screen decks · chute liners
(RELEASE)
How a batch gets released
IncomingMill certificates filed by heat number to EN 10204 3.1; every stainless batch gets positive material identification.
First articleThe first part of every batch is inspected: hole position and bend angle measured against the drawing.
WeldingWPS and WPQR to ISO 15614-1, welders qualified to ISO 9606-1; visual and dye-penetrant testing on request.
Final releaseDimensional report, material certificates and coating thickness readings travel with the batch.
- ISO 9001:2015
- EN ISO 3834-2
- EN 1090-2 EXC2
- ISO 9606-1
- EN ISO 1461
- EN 10204 3.1
(THE PLANT)
The two shops in Jimo
Two shops, 21,600 m², 640 tonnes of steel a month.




- 2011founded
- 180people, 14 engineers
- 640 tof steel a month
- 68%exported
(FAQ)
What we get asked first
What tolerance do you work to?
±0.2 mm on laser-cut and formed features, ±0.02 mm on machined ones. Where the drawing states a tolerance, the drawing wins.
What drawing formats do you take?
DXF, DWG, STEP or a dimensioned PDF — with material, quantity and the finish you want.
What comes with the material certificates?
EN 10204 3.1 certificates filed by heat number, and positive material identification on every stainless batch.
Which finishing standards apply?
Hot-dip galvanising to EN ISO 1461 and powder coating to EN 13438, with coating thickness measured on every batch.
How long is the first article?
First article in 10–15 working days; repeat batches in 25–35 days from drawing release.
(START HERE)
Start with one part
Priced in 48 hours
Send a drawing, or just the part number and a photo. We quote the route, the finish and the packing in one reply.
Start a conversation(RFQ)
Send the drawing, get a price
- Drawing review and quotation within 48 hours on working days
- First article in 10–15 working days
- sales@ironbeck.example.com · WhatsApp





