Battery container
- Capacity
- 3.7 - 5.0 MWh
- Cell
- LFP 314 Ah
- Ingress
- IP55
Grid-connected BESS
Utility-scale and C&I battery energy storage for EPC contractors, developers and network operators.
Product lines
Container, PCS, EMS and module, sized per project.




System architecture
Project record
Capacity, application, location and go-live date.



01 / 03 · project record
120MWh
Four-hour block co-located with a PV plant, commissioned in two phases. Fire lanes between the container rows set the site footprint.
18MWh
Grid-forming configuration. Primary-reserve prequalification was run on the delivered block itself.
6MWh
Behind-the-meter installation on a constrained industrial connection, dispatched against the site load profile.
Company
420 people across engineering, assembly and field service.
// Since //
2014
Founded

4 GWh
Annual assembly capacity
52,000 m²
Plant floor area
Certification

Service
Pre-commissioning, site supervision, grid-code tests
Live telemetry, alarm escalation, SCADA export
Regional stock: modules, PCS boards, cooling
Contractual capacity retention schedule

Project enquiry
Connection voltage, duration, grid code and site constraints are enough to start.