
Craft brewhouse, fermenters and CIP, built to your brewery layout
Stainless 5–50 hL brewhouses, unitanks, bright tanks and CIP, welded in Jinan.
Browse the rangeBrewhouse to bright tank
Every vessel ships with tri-clamp fittings, a pressure test record and a piping drawing.
KM-BBrewhouse
- 5–50 hL batch
- 2–4 vessels
- Electric · steam · direct fire
KM-UUnitank fermenters
- 5–100 hL
- 60° cone
- 1.5 bar
KM-BTBright tanks
- 5–100 hL
- 2.0 bar rated
- Carbonation port
KM-CIPCleaning stations
- 2- or 3-tank
- 300–500 L tanks
- Electric heating
KM-GLGlycol and utilities
- 5–60 kW chillers
- Hot and cold liquor
- Valve skids
Sizes, options and drawings
Brewhouse size table, kegging skids and PLC panels are listed on the range page.
Compare brewhouse sizesSize your brewery
Pick a batch size and brews per week; the equipment list follows.
- Brewhouse
- KM-B20 · 20 hL batch
- Output a year
- ≈ 3,840 hL
- Unitanks
- 8 × 20 hL
Output = batch × brews per week × 48 brewing weeks. Unitanks = brews per week × 2, from a 14-day cycle with one batch per tank.

Drawing to first brew
Layout drawings
Floor plan, drains and utility loads for your room.
Fabrication
TIG welding and polishing in Jinan.
Factory test
Water and pressure test, PLC run-through, then crating.
Shipping
Crated and loaded into 40 ft containers.
Installation
Our engineer connects the piping and runs the first brew with you.

Jinan fabrication works
Every vessel is pressure-tested and weld-logged before it leaves the floor.
Recent installations
- 2025Monterrey, MexicoContract brewery50 hL 4-vessel brewhouse · 8 × 100 hL unitanks
- Scope
- Brewhouse · unitanks · CIP · glycol
- Batch
- 50 hL · 6 brews/day
- Install
- 14 weeks

- 2025Melbourne, AustraliaTaproom brewery10 hL 3-vessel steam brewhouse · 6 × 10 hL unitanks
- Scope
- Brewhouse · unitanks · bright tanks
- Batch
- 10 hL · 2 brews/day
- Install
- 8 weeks

- 2024Ontario, CanadaRegional brewery30 hL 4-vessel brewhouse · 10 × 60 hL unitanks
- Scope
- Brewhouse · unitanks · CIP
- Batch
- 30 hL · 4 brews/day
- Install
- 11 weeks

- 2024Tallinn, EstoniaBrewpub5 hL 2-vessel electric brewhouse · 4 × 5 hL unitanks
- Scope
- Brewhouse · unitanks · glycol chiller
- Batch
- 5 hL · 1 brew/day
- Install
- 4 weeks

Client names withheld.
See all installations



Send your room layout
A floor plan and the ceiling height are enough to start.

- sales@kettlemere.example.com
- Reply within one working day, with a layout sketch