
CNC machining parts made to your drawing
Aluminium, steel, stainless and plastics. One prototype to 20,000 pieces.
Capabilities
Six processes, one machine shop
Industries
Parts we machine for four industries
Materials / at a glance
Other grades on request, with mill certificates.
- 01Aluminium6061 · 7075 · 2024 · 5083Aluminium grades
- 02Steel1045 · 4140 · 42CrMo4 · tool steelsSteel grades
- 03Stainless303 · 304 · 316L · 17-4PHStainless grades
- 04PlasticsPOM · PEEK · PA66 · PTFEPlastics grades
How an order runs
Drawing to shipment, five steps
Send STEP, IGES, DWG or PDF. We sign an NDA on request.
What to send us
Step
Send the drawing
STEP, IGES, DWG or PDF, with material, quantity and critical tolerances.
- STEP
- NDA
Step
DFM review
An engineer marks features that add cost or risk and suggests changes.
- 24 hours
- Tolerances
- Material
Step
Quote
Unit price per quantity break, fixtures if any, and lead time.
- 48 hours
- Price breaks
- Lead time
Step
First article
First parts measured on the CMM; you approve the report before the batch.
- FAI report
- CMM
- Approval
Step
Batch and ship
Lot inspection, material certificates and export packing.
- EN 10204 3.1
- Lot report
- Packing
01/05
About
180Staff
A Qingdao machine shop since 2009
64 CNC machines, 12 of them 5-axis, on 8,600 m². ISO 9001:2015 and IATF 16949:2016.
2009
Founded

64
CNC machines
8,600 m²
Shop floor
How we hold ±0.01 mm

01Drawing review
Critical dimensions are flagged before the first cut.
02First-article inspection
Every dimension measured and reported before the batch runs.
03In-process checks
Critical features checked at set intervals on the machine.
04CMM final inspection
Coordinate measuring machine, with a report for each lot.
05Documents
Material certificates to EN 10204 3.1; PPAP on request.
Send a drawing for a quote
DFM review within 24 hours, quote within 48. NDA on request.
rfq@lathewick.example.com




