Build-to-print molder
Custom Plastic Injection Molding and Rubber Parts to Your Drawing
Injection molded plastic, overmolded parts and rubber seals, tooled in house.
- DFM report
- 3 days
- T1 samples
- 25–35 days
- Exported
- 79%

What we mold
Part Families We Mold
Four families, one tool room, one quality system.
Material selector
Pick a Material by Service Condition
Two choices give a shortlist to quote against.
Tooling in house
Drawing to First Article
Four steps, each with a number of days.




- 01
DFM and mold-flow report
3 working days
Wall, draft, gate position and shrink notes come back with the quote.
- 02
Tool build
Plastic 20–30 days · rubber 10–15 days
Steel tools are cut in our own tool room, and you own the tool.
- 03
T1 samples with first-article report
25–35 days from tool order
CMM report on every critical dimension, shipped with the samples.
- 04
PPAP and volume
18–25 days after approval
PPAP on request; matched spares kept for 5 years.
The plant
Capacity in Numbers
46
injection presses
60–850 t, six of them two-shot
Rubber presses
Compression, transfer and LSR
34presses
New tools
Built in our own tool room
180a year
Exported
Shipped to 34 countries
79%

Quality
Inspection Before Shipping
First article
CMM report on every critical dimension.
Every lot
Vision sort on seals and sealing faces.
Rubber lots
Shore A, tensile and compression set per batch.
Retention
Samples kept 3 years, by lot number.
Standards we build to
Request
Start with Your Drawing
Quotation within 24 hours on working days.

- Address
- Taizhou, China



